Home Technical sheets Lost formwork and concrete Iglu formwork installation instructions
Daliform
Iglu formwork installation instructions
Swipe to turn the page
To see the page exactly as printed, open it in the PDF. Open the PDF at page 2
Text of page 2
Rev. 06 - 07/2015 2 Certified Management System ISO 14001:2004 - ISO 9001:2008 - BS OHSAS 18001:2007 - SA 8000 A1 A2 A3 A4 B1 B2 B3 B4 B5 B6 C1 C2 C3 C4 C5 C6 A5 A6 INSTRUCTIONS FOR USE Partner of GBC Italia. Tel. +39 0422 2083 - Fax +39 0422 800234 export@daliform.com - www.daliform.com Via Serenissima, 30 - 31040 Gorgo al Monticano (TV) - Italy Position the fi rst element to the upper left with respect to the work surface, making sure that the arrow is pointing up. Join the elements in a sequence, by horizontal rows, from left to right and from top to bottom. If there is no electrowelded mesh, you must step onto the self-bearing platform making sure that you do not tread on the perimetral portions of the shuttering’s base, which have an anti-slip fi nish where the parts are overlapped. 1st row 2nd row 3rd row Compliance with the following instructions enables the realization of the structure properly and in compliance with safety procedures. Follow them carefully. Without electrowelded mesh: With electrowelded mesh: EVERYWHERE YES YES NO www.baygar.com