Skip to content
Search the catalogues

Search the text of every catalogue (in Spanish): we take you to the exact page.

Language: English
Contact

Home Technical sheets Lost formwork and concrete Iglu disposable formwork

Daliform

Iglu disposable formwork

Download PDF in English, 26 pages Open the full PDF

To see the page exactly as printed, open it in the PDF. Open the PDF at page 26

Text of page 26

30 8,20/9,60 x 2,45 6,20 x 2,45 8,40 x 2,45 7,20 x 2,45 13,60 x 2,45 20 feet 40 feet j k m l o n Supply and installation cost grid Total cost €/m2 No. Item U.M. Quantity Unit price Total 1 Supply and casting of lean concrete with a thickness of ____ m3/m2 2 Supply of the IGLU’® formwork, h ___ m2/m2 1 3 Dry installation of the IGLU’® formwork on the prepared surface H/m2 0.0125 4 Supply and positioning of the welded mesh Ø ___ mm - 20x20 cm Kg/m2 5 Supply and casting of concrete C25/30 - for filling up to the crown m3/m2 6 Supply and concrete casting CLS C25/30 - for a slab of cm ___ m3/m2 Logistics - pallet capacity Tractor (8.20/9.60x2.45) Trailer (6.20x2.45) Tractor+ Trailer type “BIG” (8.40+7.20x2.45) Semi-trailer (13.60x2.45) 20 feet container 40 feet container 14/16 10 14 + 12 24 10* 20* MEANS OF TRANSPORT NO. OF PALLETS * the m2 per pallet can vary based on the type of container. The information contained in this catalogue could be changed. Before placing an order, request a confi rmation or updated information from the DALIFORM GROUP, which reserves the right to make changes at any moment without notice. In consideration of recycled material, it is specifi ed that there are tolerance margins caused by environmental factors. www.baygar.com