Skip to content
Search the catalogues

Search the text of every catalogue (in Spanish): we take you to the exact page.

Language: English
Contact

Home Technical sheets Lost formwork and concrete Iglu disposable formwork

Daliform

Iglu disposable formwork

Download PDF in English, 26 pages Open the full PDF

To see the page exactly as printed, open it in the PDF. Open the PDF at page 13

Text of page 13

17 1 2 3 A1 A2 A3 A4 B1 B2 B3 B4 C1 C2 C3 C4 Dry assembly method Fig. 1 - Dry positioning of the fi rst formwork, the arrow is facing the foundation curb. Fig. 2 - Dry positioning sequence of the modules by row. Fig. 3 - Detailed view of the male-female system linking phase - note the perfect seal of the feet. Position the fi rst element to the upper left with respect to the work surface, making sure that the arrow is pointing up (Fig. 1). Unite the elements in sequence, by horizontal row, proceeding from the left towards the right and from the top downwards (following the direction normally used for writing), as shown graphically on the crown of each unit (Fig. 2). To unite the units in sequence, be careful to perfectly link the “male-female” hooking elements at the base of the support feet (see photo sequence - Fig. 3). 1 2 3 Row Row Row rst nd rd www.baygar.com