Home Technical sheets Lost formwork and concrete Iglu disposable formwork
Daliform
Iglu disposable formwork
Swipe to turn the page
To see the page exactly as printed, open it in the PDF. Open the PDF at page 12
Text of page 12
16 1 5 4 6 2 3 1 2 1 3 2 5 6 4 Method for creating under-fl oor cavities Preparation of the natural ground. Laying the welded mesh Ø 6 20x20 above the formworks. Positioning the linking male/female formworks, working from the left to the right, from the top down, making sure the arrow is facing upward. Casting the concrete starting from the centre of the arc, letting it go inside the legs of the Iglu’®. Preparation of the lean concrete foundation, to be sized according to the loads and capacity of the ground. Positioning the L-Plast panel around the foundation beams after positioning the necessary reinforcements. Casting the concrete starting from the centre of the arc, letting it go inside the legs of the Iglu’®. Continue the casting fi lling all curbs and foundation beams. Detailed view of the complete sequence of positioning the Iglù®, subsequent reinforcement, casting and smoothing. Casting method To ensure a correct installation and perfectly created under-fl oor cavity please refer to the product’s usage requirements. www.baygar.com