Skip to content
Search the catalogues

Search the text of every catalogue (in Spanish): we take you to the exact page.

Language: English
Contact

Home Technical sheets Lost formwork and concrete Atlantis disposable formwork

Daliform

Atlantis disposable formwork

Download PDF in English, 14 pages Open the full PDF

To see the page exactly as printed, open it in the PDF. Open the PDF at page 8

Text of page 8

8 1 4 5 6 7 2 3 A B C 4 1 2 3 5 6 7 Installation method (Images and schemes referred to atlantis 50x50 cm with pipe having diameter 11 cm) Method for creating under-fl oor cavities The Atlantis System is made up of three basic elements in its standard configuration: Atlantis formwork h 16 cm (A), pipe (B) diameter 110 mm (external and of a variable height, slip-on pipe base (C) with an enlarged support surface. In order to plug the formworks laid against the wall, it is suggested to use the panel accessory made of polystyrene. The Atlantis formworks are simple to install: the procedure consists of inserting the pipe into the slip-on base and then linking the Atlantis formwork to the far end of the pipe using the bayonet coupling. Each piece can be hooked to the adjacent piece thanks to the shaped grooves for the male/female linking. For this, simply position them in horizontal rows from the left to the right, with the arrow on the top turned outward from the operator, proceeding to the end of each row. Thanks to the modularity and lightness of Atlantis, each operator will be able to position up to 30 m2 per hour standing comfortably in an erect position. Preparation of the natural ground. Pose the elements from left to the right; once completed a row, proceed with next one. Laying the welded mesh Ø 6 20x20 above the formworks. Insert polystyrene panels, between wall and formwork, along the cavity perimeter. Realization of concrete casting, fi lling previoulsy Atlantis pipes and then covering the formworks till reaching the quote of project. Preparation of the lean concrete foundation, to be sized according to the loads and capacity of the ground. Pose of Atlantis system (foot+pipe+formwork) Details of the complete Atlantis System positioning sequence. To ensure a correct installation and perfectly created under-fl oor cavity please refer to the product’s usage requirements. www.baygar.com