Saltar ao contido
Buscar nos catálogos

Busca no texto de todos os catálogos (en castelán): levámoste á páxina exacta.

Idioma: Galego
Contacto

Inicio Fichas técnicas Encofrado perdido e formigón Encofrado perdido Eolo

Para ver a páxina tal como está no catálogo, ábrea no PDF. Abrir o PDF na páxina 5

Texto da páxina 5

7 h L b A2 A3 A4 A1 B1 C1 C2 C3 C4 C5 B2 B3 B4 B5 A5 1 2 3 4 5 50 x 50 x 27 h 0,040 1,990 6 110 x 110 x 250 h 55 220 510 25 205 7 50 50 27 50 6 Installation and cement casting Technical data Fig. 1 - Dry positioning of the fi rst formwork, the arrow is facing the foundation curb. Fig. 2 - Dry positioning sequence of the modules by row. Position the fi rst element to the upper left with respect to the work surface, making sure that the arrow is pointing up (Fig. 1). Unite the elements in sequence, by horizontal row, proceeding from the left towards the right and from the top downwards (following the direction normally used for writing), as shown graphically on the crown of each unit (Fig. 2). Laying the welded mesh Ø 6 20x20 cm through the notches next to the nozzles, specifi cally created for hosting the reinforcement mesh. Casting of concrete C20/25 of 6cm of height, starting from the centre of the arc, letting it go inside the legs of Eolo. Subsequent vibration. Removal of Eolo plugs following the solidifi cation of the cement casting. Working dimensions Quantity of concrete to the crown Weight per piece Nozzles height Pallet dimensions Pallet m2 Pallet pieces Pallet weight L-Plast h panel L-Plast L panel L-Plast p panel cm m3/m2 Kg./pcs. cm cm m2/PAL pz./PAL Kg./PAL cm cm cm 4 plugs to close the nozzles with their dirt-stopping grilles 1st Row 2nd Row 3rd Row 5 www.baygar.com