Inicio Fichas técnicas Encofrado perdido y hormigón Lámina de aislamiento acústico U-Boot Silence
Daliform
Lámina de aislamiento acústico U-Boot Silence
Desliza para pasar de página
Para ver la página tal como está en el catálogo, ábrela en el PDF. Abrir el PDF en la página 5
Texto de la página 5
5 1 3 5 2 4 6 Installation The installation must be done in a rigorous manner and with particular care to avoid sound transmission to occur that would compromise the fi nal result. The installation steps are: preparation of the substrate, laying of U-Boot Silence, making of the fl oating screed. Prepare the installation surface (which will be placed on the soundproofi ng mantle U-Boot Silence) so as to be smooth, clean and free of foreign objects that may cause perforation of the mantle or reduce the performance. Lay the acoustic mantle U-Boot Silence taking care to properly pull the edges of the carpet, then seal up the junction with insulating tape Rotocell AD. Please remember that the lack, even just partial, of the tape may cause sound transmission. After waiting for the curing of the screed, it is possible to proceed with the fl ooring. Warning: the exceeding edging strip should not be trimmed before the laying of the fi nal fl ooring has been completed. Fix the edging strip to the wall at "at least" the same height as that of the screed plus that of the fi nal fl ooring, folding the selvage horizontally to create an "L" between the wall and the horizontal surface. Make sure the material ensures the complete desolidarisation between screed and structural elements of the work at all corners and thresholds. Proceed with the casting of the slab with concrete of high strength and good consistency. The screed should be well beaten (especially on the sides and corners), constipated throughout its thickness, stricken off and fl oated (by hand or by helicopter) in a workmanlike manner. Once fi nal fl ooring has been completed, cut the excess part of the Superfascia AD with a cutter at the level of the fl oor, whose head should then be masked by the baseboard. Superfascia AD Rotocell AD www.baygar.com