Saltar al contenido
Buscar en los catálogos

Busca en el texto de todos los catálogos: te llevamos a la página exacta.

Idioma: Español
Contacto

Inicio Archivo Urbanización Depuración de aguas residuales (manual en inglés)

ISEA

Depuración de aguas residuales (manual en inglés)

Archivo · 2012 Puede no estar al día; pregúntanos antes de decidir.

Descargar PDF en inglés, 51 págs. Abrir el PDF completo

Para ver la página tal como está en el catálogo, ábrela en el PDF. Abrir el PDF en la página 24

Texto de la página 24

24 Pumping station PRATICA, made of PE. One-piece tank with screw-on cover to control it and to install pumps,one or two,that can have an alternate or parallel operation.Clapets and valves are installed on the delivery pipes.Pumping station may be accessorised with floaters.Pumps are of different materials and may lift a wide range of flows (ex:0-38 mc/h) to different hei- ghts (ex: 0-12,5m). A control panel is included in models from 1000l on to regulate the pumps’ operation. Machinery is adequate to work with black water and used water in general,rain water and parking wash out.In case larger bodies are brought about with the flow, grinder pumps may be installed. Dig a hole of appropriate dimensions and line a 10 cm thick light concrete layer at the bottom, level it.Lay the plant down.Fill it with clean water and fill the gaps around it with light concrete. Finish with a 5 cm thick light concrete casting and a 40 cm thick earth layer on top (or with Verify that installation has been correctly carried out. Check that pumps work correctly. Clean the plant at least once a year.Pumping stations are to be used where it is necessary to quickly dispose of white and black water passed trough a grid. M O D A L I T A ' D I I N T E R R O a l l e g a t o 1 reinforced concrete in case of car passage on top of the plant ). Make sure that covers are always inspectionable. In case of superficial water table it is compulsory to create a water tight concrete chamber around the tank. Isea is always available to supervise plant installation. Pumps are in submersed free installation. They need to be taken out once a year to check that the impeller is working correctly.Also check elec- trical components in the panel. INSTALLER ENGINEER (SPECIFICATIONS) USER I N S T A L L A T I O N I N S T R U C T I O N S a n n e x 1 WALK-ON SOLUTION DRIVE-ON SOLUTION drive-on cover drive-on cover reinforced concrete light concrete cm 10 light concrete cm 10 MAX 40 cm Sewage system Sewage system walk-on cover www.baygar.com